These are the bushings on the bottom of the Bob tach plate but on the machine side (already changed the plate side ones) I washed the weld off of the one and removed the bushing and am almost done removing the other - question is what is the best way to line them up ? I don't have fancy tools but can get it done. I was going to line them up by installing the pin and tacking the bushing on then have a helper run the machine and check for binding. Am I missing any easy accurate ways?
Inscription à :
Publier les commentaires (Atom)
0 commentaires:
Enregistrer un commentaire