Need input-- using conveyor system to move material on reclaim jobs

samedi 3 juin 2017

Hopefully this is the right place to post. We do a lot of reclaim work, old coal pits that were stripped back in the 40's through the 60's or later. We generally do the larger jobs, 500,000 yards and up. The owner and I were kicking ideas around and he mentioned a conveyor system to move it from the various piles over the high wall into the pit. It would take various lengths depending on how it was stripped. He figures longest run 600'. Currently we use scrapers and dozers depending on...