Upgrade excavator or turn down work?

samedi 23 décembre 2017

Lost a considerable sum in work lately, due to the fact that the sand-embedded river cobble found some areas around here is pretty unstable, easy to dig but requires a great deal of material removal to achieve depth and safe working conditions. My KX161 does fine, but the 24" bucket takes time compared to a midi. My rates are fair and allow me running/replacement costs plus profit. My machine works well for 60%-70% of my jobs. The time factor is what's costing me work - I can't...

Upgrade excavator or turn down work?

Upgrade excavator or turn down work?

0 commentaires:

Enregistrer un commentaire