Digging below sea level 6 feet down 5 feet from shoring wall question

vendredi 27 juin 2014

Hey guys im new to the forum



I got a question if u can help ?



I'm supposed to dig a pad 10 x 6 , 6 feet below grade , which is below sea level and the pad is 5 feet from the shoring wall. With that in mind i was told to cut a 1/4 slop for the side closest to the wall. Problem is knowing that I can get the other three sides good, to have ppl jump in the hole is my concern cause i know the material will just fall back in and create its own slope, just wondering wat u guys would do ?