Please help! :(

dimanche 27 décembre 2015

Hi! I am a year1 student in singapore who just started civil engineering.Please don't mind me but i really need help with excavators.
So i am given an assignment where i hve to place a concrete precast in a trench dimensions 6km long 0.75 m depth and 1.2m depth worth 5400cbm
I am using a mini excavator (cuz industrial area) with 47.93cubm per hr.

After including loading and dumping time of the earth etc,I'm coming at abt 2 days to complete the job with 1 excavator and 2 trucks.
Is it realistic? Please help. Really appreciate it.


Please help! :(

0 commentaires:

Enregistrer un commentaire